Free Quote & ROI Analysis

Get Your Custom
Quote Today

Tell us about your project and a specialist WXABK engineer will respond within 24 hours —
with a fully itemised quote, equipment recommendation, and free ROI analysis tailored to your operation.

Write To Us

Built for Your Budget. Priced for ROI.

WXABK machines typically achieve full payback within 12–24 months through labour savings, rework reduction, and increased throughput. Every quote includes a free ROI model based on your actual numbers.

Transparent Pricing

No hidden fees. A fully itemised quote covering equipment, freight, commissioning, and warranty — delivered within 24 hours of your enquiry.

Free ROI Calculator

Our engineers model your exact payback period based on your current labour rates, rework costs, and production output targets — at no charge.

Financing Available

Leasing, hire-purchase, and instalment payment options available through our financial partners in 30+ countries including Canada.

Fixed-Price Contracts

No surprise costs. Engineering, manufacture, freight, and on-site commissioning are all quoted upfront in one transparent contract.

Custom Engineering at No Extra Design Cost

Need a non-standard capacity, control system, or integration? Our engineers adapt the machine to your spec — no design surcharge on standard customisations.

Our Social Media

Send Us a Message

Fill in the form and a specialist engineer will respond within 24 hours.

What Happens Next

From Quote to Running Machine

A clear, no-surprise process from the moment you submit your enquiry to the day
your machine is commissioned and running.

You Send Enquiry

Fill in the contact form or email us with your project details, workpiece dimensions, and production requirements.

Custom Engineering

A specialist engineer reviews your requirements within 24 hours and prepares a tailored equipment recommendation.

Manufacturing & QC

A fully itemised quote arrives with equipment specs, pricing, lead time, freight options, and ROI analysis.

Global Shipping

After approval, manufacturing begins in our ISO-certified facility. Full FAT before shipping with all export documentation.

Return on Investment

Payback in as Little as 12 Months

WXABK welding automation machines pay for themselves quickly through measurable savings across labour, rework, and throughput. Here is what our clients typically see in the first year.

Up to 60% Faster Cycle Time

Automated rotation eliminates manual repositioning, cutting weld cycle times by up to 60%.

Reduce Labour Dependency

One operator can run multiple automated stations — dramatically reducing skilled welder headcount costs.

Near-Zero Rework Rate

Consistent flat-position welding eliminates the quality variations that cause expensive rework and scrap.

Increase Annual Output

Higher throughput from the same floor space and crew — directly boosting revenue per square metre.

Faster Cycle Time
60 %
Month Payback
12
Client Satisfaction
98 %
Standard Warranty
24 mo

Financing & Payment Options

Flexible Payment. No Barriers to Automation.

We work with financial partners in 30+ countries to make sure budget is never a reason to delay upgrading your welding operation.

 

Equipment Leasing

Spread the cost over 12–60 months with fixed monthly payments. Keep capital free for other investments while your machine generates ROI from day one.

Hire Purchase

Pay in structured instalments and own the machine outright at the end of the term. Ideal for businesses looking to build long-term asset value.

Trade Credit Terms

Established businesses may qualify for extended payment terms. Contact our sales team with your company details to discuss available credit options.

Available in Canada, USA, UK, Germany, Australia, and 25+ more countries.

Client Testimonials

What Our Clients Say

From Canada to Germany — here is what fabricators say after receiving their WXABK quote and machines.

WXABK welding machines 200T self-aligning rotators have completely transformed our vessel shop. Weld quality improved dramatically and our output doubled in the first quarter after installation.

Martin Rhodes Production Manager — TexOil Fabricators, Canada

We ordered the H-beam welding line for our new steel frame factory. Commissioning was smooth and the WXABK welding machines team stayed on-site for a full week until everything ran perfectly.

Zhang Hui Factory Director — Jinlong Steel, China

Exceptional build quality. We have purchased rotators from four different suppliers over the years — WXABK welding machines is clearly the most robust. The gearbox after 3 years still has zero issues.

Aleksei Petrov Chief Engineer — EuroPipe Group, Germany